Bathroom Remodeling in Alamance, Orange & Guilford County, NC
Is it normal for a bathroom to already need repairs a few years after it was "finished"? At Triple R, we build it right the first time - so you're not back here again in three years.
From full custom remodels to targeted repairs, we've handled it all. Heated floors, steam showers, custom vanities, freestanding tubs, tile surrounds, body sprayers, ADA-compliant setups, basement bathroom additions - if you can dream it, we can build it.
Every bathroom project we take on gets the same attention to detail: proper waterproofing from the start, quality materials, and craftsmanship that holds up for years. No shortcuts. No coming back to fix what should have been done right the first time.
Browse the gallery below to see real projects we've completed for homeowners across Alamance, Orange, and Guilford County, NC. See something you love? Contact us and let's talk about what we can do for you.
Check this one out! Full bathroom remodel. Heated floor, 3 shower heads, 2 body sprayers, and 1 steam setting. Free standing tub, custom vanity, custom backsplash. This bathroom checks all the boxes! Check out the blog for the whole breakdown of this masterpiece.
Absolutely killed this one, custom oak vanity, Colt stain by Diamond, Floor Decor with the hookup on that amazing glass tile. Check out the blog for the whole breakdown of this masterpiece.
Bathroom was so large we had to add a second thermostatic valve! That bench is the same material as the vanity top. We love how it pulls it all together! Check out the blog for the whole breakdown of this masterpiece.
New shower, 12"x4" tile laid vertical with a stair step. Shower started 42 inches wide with ADA one piece shower. New shower 60" wide
Everything went on this one, tile shower, new toilet, vanity, flooring, and mirror.
Two Niches with tile that matches floor
River rock floor tile
Full bathroom remodel. Tile floor and shower surround with a lighted niche installed. New vanity, toilet, and hand made custom mirror.
Attention to detail is key
New tub and surround, flooring, trim, vanity, and toilet.
Another full remodel, 12x24 smartcore vinyl tile, with a new vanity, mirror, light, toilet, baseboards, and paint.
Basement half bath turned full bath. Duct moved and an outlet properly eliminated.
AFTER the plumbing, homeowner was smart enough to save extra tile. I was able to match grout color and install tile... never know that floor was tore apart.
After rough framing, exhaust fan/light was installed running 2 different switches.
Finished product, The Kalamazoo Loft officially has 2 toilets!
Beautiful shower surround selected with an amazing matte black shower trim kit and shower door.
Bathroom added to basement on Pine Lake. Block foundation drywall furred out and finished.
Complete Remodel, vanity, lights, floor, toilet, tub, surround, and trim work.
New SInk addition in bathroom
Bathroom Renovation by Tripe R Haw River, NC

